Thanks Guys,
The thing that looses me is Boilers (Fullstop), lets put the clauses etc aside and consider WHY would such a requirement be listed for Class 1 Boilers (Or any boiler for that matter) As we are discussing Material Minimum Design Temperatures and Boilers designed specifically for Elevated Temperature Service in the same sentance? Any Thoughts
Sorry for not paying more attention to this post, I think it is a great idea!
Cheers
Mal
BB,
Application Code in this Case is AS1228.
Regards
Mal